---
title: "Multi-stage projects"
slug: "multi-stage-projects"
abstract: "Introduction to multi-stage projects, with detailed descriptions."
---
# Multi-stage projects

A multi-stage project is a coordinated set of [stages](https://doc.sitecore.com/ch/en/users/content-hub/add-a-stage.html "Add a stage") that allows users to achieve specific marketing objectives, such as a product launch. Multi-stage projects are used for complex workflows where time and resource management are important. A multi-stage project consists of a hierarchy representing a sequence of work and related dependencies. Stages can include [milestones](https://doc.sitecore.com/ch/en/users/content-hub/add-a-milestone.html "Add a milestone") and each stage is defined in a similar way to a basic project, using any of the following:

- [Tasks](https://doc.sitecore.com/ch/en/users/content-hub/tasks.html "Tasks")
- [Budgets](https://doc.sitecore.com/ch/en/users/content-hub/build-a-budget.html "Build a budget")
- [Resources](https://doc.sitecore.com/ch/en/users/content-hub/plan-resources.html "Plan resources")

In the following example, between the *Review and Approval* stage and the *Localization Stage*, a diamond shape identifies a milestone (*Content Complete*).

![Multi-stage project example](https://doc.sitecore.com/api/markdown-image/ch/en/users/content-hub/images/multi-stage_project_example.png)

## Project overview

The **Overview** tab displays the content used in the project. By clicking a tile, you can open the corresponding details page, which includes the following sections:

| Section | Description |
| --- | --- |
| **Content** | Filename, title, description, and locale. |
| **Localized from** | Original file that was localized. |
| **Localized to** | List of files to which the asset, content, or fragment was localized to. |
| **Version history** | List of versions. You can set a particular version as the master, which means it is the version used by default. You can also view the asset or content details for a particular version, or add comments and annotations to a particular version. |
| **Local reviews** | Displays [local reviews](https://doc.sitecore.com/ch/en/users/content-hub/review-projects-and-jobs.html). |
| **Parallel reviews** | Displays [parallel reviews](https://doc.sitecore.com/ch/en/users/content-hub/review-projects-and-jobs.html). |
| **Used as content** | Displays the projects, stages, and jobs that use the asset, content, or fragment as content, as well as the status of each. |
| **Usedasattachment** | Displays the projects and stages that use the asset, content, or fragment as an [attachment](https://doc.sitecore.com/ch/en/users/content-hub/attach-content.html) as well as the status of each. |
| **Used in tasks** | Displays the [tasks](https://doc.sitecore.com/ch/en/users/content-hub/tasks.html) that use the asset, content, or fragment as well as the status and users assigned. |

## Time overview

On the **Timeline** tab, you can see a list of all the stages in the project, with a progress bar showing the overall project progress. This lets you visualize the different stages and milestones, plus their dependencies, status, start and end dates, and duration. From here, you can add a new stage or milestone, edit the details of each stage, and modify dependencies. If delaying a stage causes the overall project to be delayed, that project is considered to be on a critical path. The critical path is a sequence of stages that must not be delayed if the project is to be delivered on time, and it represents the minimum total duration of the project. In the following example, critical paths are shown in red.

![timeline showing critical path](https://doc.sitecore.com/api/markdown-image/ch/en/users/content-hub/images/timeline_showing_critical_path.png)

[Standard operations](https://doc.sitecore.com/ch/en/users/content-hub/projects-and-jobs-operations.html "Projects and jobs operations") are available on project pages and you can use the [Content Hub Search](https://doc.sitecore.com/ch/en/users/content-hub/search,-filter,-and-select.md "Search, filter, and select") to find specific information.