Task event
This topic describes how tasks with the subtype task from Salesforce are mapped to events in Sitecore.
Format in Salesforce
In Salesforce, a contact can be associated with multiple tasks. Each task is a separate object that is linked to the contact.
Only completed tasks are read from Salesforce.
Format in Sitecore
In Sitecore, task details are stored in an event. The event is associated with an interaction. The following interaction facet is used to identify that the interaction came from Salesforce:
Facet Name |
|
Facet Type |
|
The following event type is used to store event details:
Event Type |
|
Mapping values
You must have separate mappings for the interaction facet and the event.
Source objects |
interaction facet, event |
Task object from Salesforce |
Target object |
interaction facet |
|
Mapping definition |
interaction facet |
Salesforce to xConnect Interaction Mappings maps to Salesforce Task to xConnect Interaction Salesforce Facet |
Target object |
event |
|
Mapping definition |
event |
Salesforce to xConnect Event Mappings maps to Salesforce Task to xConnect Event |